Kazakhmys Corporation, KAZAKHSTAN - Optimization of Copper Ore Production in Zhezkazgan

The mining operator Kazakhmys Corporation encountered extremely high costs for the maintenance of the technical equipment. This was due to inaccurate drillings, the use of too much explosives, insufficient road construction and lack of maintenance.

The Consultant´s task was the investigation of the causes of the high costs and the elaboration of cost reducing measures.

Activities performed:

  • Design
  • Calculation
  • Bidding process
  • Contract negotiations
  • Detailed design
  • Contract management
  • Economic evaluation of the production process and elaboration of cost optimizing measures

Project Locations

World map showing the locations of our projects